Syvaska Wind Farm 1 Stage 6 Phase & 2 Stage 9 Phase

  • Home /
  • Assets /
  • Syvaska Wind Farm 1 Stage 6 Phase & 2 Stage 9 Phase

Description of the power plant

Onshore wind farm Syvaska Wind Farm 1 Stage 6 Phase & 2 Stage 9 Phase is located in south part of Ukraine - Chaplynskyi district, Khersonska region, Ukraine. The power plant is putted into operation on 2021 with installed capacity- 31.2 MW. Ltd "Syvashenerhoprom" is a legal entity operating the power plant. It obtained the license for electricity generation on July 12, 2012 and permitted for the Feed-in-tariff in hryvnias equivalent of 8.82 eurocents starting from April 14, 2021.

LTD "SYVASHENERHOPROM"

Putted into opperation

Mar 2021

Installed capacity

31.2 MW

Feed-in-Tariff

8.82¢

Location

Chaplynskyi district, Khersonska region, Ukraine

Key Indicators

N/A

Capacity Factor

The unitless ratio of an actual electrical energy output over a given period of time to the maximum possible electrical energy output over that period.

6.89

Wind speed

Average annual wind speed for 10% windiest areas in 10 km area around wind farm location based on satellite data (m/s)

8.82

Tariff

Tariff established by NERC
(eurocents/KWh)


a share of power plants with lower indicator value among all RES
a share of power plants with lower indicator value among power plants of the same type

Contractors

Additional information

In a paid subscription, you can additionally find answers to the following questions:

In addition, with a paid subscription, you can familiarize yourself with the available permits for Syvaska Wind Farm 1 Stage 6 Phase & 2 Stage 9 Phase

The presented list reflects the directions in which information on assets is collected. On the Syvaska Wind Farm 1 Stage 6 Phase & 2 Stage 9 Phase some of this information may not yet be available, however, work is underway to collect the missing information and expand the amount of information provided to customers of a subscription.

Have ideas to improve energo.ua?

Energo.ua project is dedicated to add transparancy to Ukrainian renewable energy market.

In the system

1521

Assets

1332

Projects

4619

Companies

1A Sportyvna sq.,
Kyiv, 01001