Description of the power plant
Onshore wind farm Wind Farm Dnistrovska Vitroelektrostantsiya 1 Stage is located in south part of Ukraine - Bilhorod-Dnistrovskyi district, Odeska region, Ukraine. The power plant is putted into operation on 2021 with installed capacity- 40.0 MW. Ltd "Dnistrovska Vitroelektrostantsiya" is a legal entity operating the power plant. It obtained the license for electricity generation on April 14, 2021 and permitted for the Feed-in-tariff in hryvnias equivalent of 8.82 eurocents starting from April 28, 2021.
Putted into opperation
Mar 2021
Installed capacity
40.0 MW
Feed-in-Tariff
8.82¢
Location
Key Indicators
Capacity Factor
The unitless ratio of an actual electrical energy output over a given period of time to the maximum possible electrical energy output over that period.
Wind speed
Average annual wind speed for 10% windiest areas in 10 km area around wind farm location based on satellite data (m/s)
Tariff
Tariff established by NERC
(eurocents/KWh)
Contractors
Designer
ME TAM "L. MULYAR" KOSAUGeneral contractor
LTD "ALTIS-KONSTRAKSHN"Additional information
In a paid subscription, you can additionally find answers to the following questions:
- What phone and email for contacts with Wind Farm Dnistrovska Vitroelektrostantsiya 1 Stage?
- What group of companies does the Wind Farm Dnistrovska Vitroelektrostantsiya 1 Stage belong to?
- Who are the beneficial owners of Wind Farm Dnistrovska Vitroelektrostantsiya 1 Stage?
- What is the wind speed at Wind Farm Dnistrovska Vitroelektrostantsiya 1 Stage?
- What is the current tariff in UAH for Wind Farm Dnistrovska Vitroelektrostantsiya 1 Stage?
- Is there a local component bonus for Wind Farm Dnistrovska Vitroelektrostantsiya 1 Stage and what is its size
- What is the capacity factor of Wind Farm Dnistrovska Vitroelektrostantsiya 1 Stage?
- What is the monthly electricity production of Wind Farm Dnistrovska Vitroelektrostantsiya 1 Stage?
- What is the annual revenue of Wind Farm Dnistrovska Vitroelektrostantsiya 1 Stage?
- What market share does Wind Farm Dnistrovska Vitroelektrostantsiya 1 Stage have in the Ukrainian renewable energy market in terms of capacity, production and revenue?
- What was the capital expenditure cost for Wind Farm Dnistrovska Vitroelektrostantsiya 1 Stage?
- Which company designed the project for Wind Farm Dnistrovska Vitroelektrostantsiya 1 Stage?
- Which company was the general contractor for Wind Farm Dnistrovska Vitroelektrostantsiya 1 Stage?
- What generating equipment (wind turbines) is installed in Wind Farm Dnistrovska Vitroelektrostantsiya 1 Stage?
- What is the size of the land plot on which Wind Farm Dnistrovska Vitroelektrostantsiya 1 Stage is located?
- What are the cadastral numbers of the parcels on which Wind Farm Dnistrovska Vitroelektrostantsiya 1 Stage is located?
- What are the exact coordinates of the location of Wind Farm Dnistrovska Vitroelektrostantsiya 1 Stage?
- When were the grid connection specification forWind Farm Dnistrovska Vitroelektrostantsiya 1 Stage issued and what capacity was approved in the specification?
In addition, with a paid subscription, you can familiarize yourself with the available permits for Wind Farm Dnistrovska Vitroelektrostantsiya 1 Stage
- Land allocation documentationWind Farm Dnistrovska Vitroelektrostantsiya 1 Stage
- Construction permits and declarative documentationWind Farm Dnistrovska Vitroelektrostantsiya 1 Stage
- Environmental Impact Assessment (EIA) DocumentsWind Farm Dnistrovska Vitroelektrostantsiya 1 Stage
- Feed-In-Tariff Setting DocumentsWind Farm Dnistrovska Vitroelektrostantsiya 1 Stage
The presented list reflects the directions in which information on assets is collected. On the Wind Farm Dnistrovska Vitroelektrostantsiya 1 Stage some of this information may not yet be available, however, work is underway to collect the missing information and expand the amount of information provided to customers of a subscription.
Have ideas to improve energo.ua?
Energo.ua project is dedicated to add transparancy to Ukrainian renewable energy market.